The original bathroom has been refurbished. The cast iron tub and period towel rail have been retained and incorporated into the design and the original marble floor has been restored.
A new bathroom and dressing room have been created in the maid's room.
A second phase is planned to provide a garage, gym and training pool opening onto the garden. |